Published
2 years agoon
By
GhanaFeedThe National Democratic Congress (NDC) has dispelled claims by the New Patriotic Party that 29, instead, of the 46 E-Block projects former President John Dramani Mahama makes claims to were completed.
The NDC said the Mahama government, in its bid to enhance access to Secondary Education, awarded a total of 124 Community Day Senior High School (E-Block) projects and completed about 50 of them by December 2016, out of which 46 were personally commissioned by President Mahama.
“The handing-over notes of the former Minister of Education under the NDC/Mahama government, the venerable Prof. Naana Jane Opoku Agyemang bears out this fact.”
It further noted that each of the Community Day Senior High Schools had an ultra-Mordern library, furnished classrooms, ICT laboratory, Biology laboratory, Physics laboratory, Chemistry laboratory, General Science laboratory, a school bus for students and a pick-up vehicle for office staff among others.
The party insists that all these facilities were inspected by the President, the Chiefs, community leaders and the media during the commissioning.
“Interestingly, the first Minister of Education of the Akufo-Addo/Bawumia government, Mathew Opoku Prempeh is on public record to have said in 2017 that the NDC/Mahama government completed 46 Community Day Senior High Schools. This was widely reported by the media. The internet never forgets.”
“Post-facto this public admission by their own Minister of Education, the Akufo-Addo/Bawumia government in a futile effort to distort the superior record of the NDC/Mahama government deceptively reclassified some completed E-Block projects as uncompleted, thereby reducing the total number to 29. This so-called reclassification was largely done on the contrived and flimsy grounds that some of the 46 completed E-blocks had no furniture even though the physical structures had been fully completed.”
“The attached document (stamped fake) being circulated by hired NPP apologists on social media is a product of this warped thinking and should be treated with utmost contempt.”
The party attached a list of Community Day Senior High Schools that were completed and/or commissioned by former President John Mahama before exiting office.
1. Seventh Day CDSHS- Abease, Pru West
2. Dermaa CDSHS- Dermaa, Tano South
3. Lambusie CDSH- Lambussie District
4. Nchumuru CDSHS- Krachi
Nchumuru
5. Maame Krobo CDSHS- Kwahu, Afram Plains South
6. Kwabenya CDSHS- Ga East
7. Atta Mills CDSHS- Ekumfi Otuam
8. Nkwanta CDSHS- Nkwanta
9. Nyanoakwaboah CDSHS- Upper West Akyim, Adeiso
10. Adobewora CDSHS- Atwima Mponua
11. Adugyama CDSHS- Ahafo-Ano South
12. Bamiankor CDSHS- Bamiankor, Nzema East District
13. Nsawora Adumafa CDSHS- Sefwi Akontonbra
14. Takorase CDSHS- Akwatia, Denkyembour District
15. Frafraha CDSHS- Madina, Accra
16. Katamanso CDSHS- Kpone Katamanso, Accra
17. Volo Community Day- North Tongu
18. Loggu CDSHS- Wa East
19. Zulugu CDSHS- Binduri
20. Daboya CDSHS- Daboya
21. Wapuli CDSHS-Saboba
22. New Longoro-Kintampo
23. Asuosu CDSHS- Offinso North
24. Agric Nzema CDSHS- Kumasi Metropolis
25. Kwamekrom CDSHS- Oti
26. Diaso CDSHS- Upper Denkyira West
27. Kyekyewere CDSHS-Upper Denkyira East
28. Moree CDSHS- Abura Asebu Kwamankese
29. Namanwora CDSHS- Agona East
30. Sankor CDSHS- Ahanta West
31. Awutu Bawjiase CDSHS- Awutu Senya West
32. Awutu Ofaakor CDSHS- Awutu Senya East
33. Anum Apapam CDSHS- Ayensuano
34.Avenorfeme CDSHS- Akatsi South
35. Fodoa Nkwanta CDSHS-Kwahu West
36. Mem Chemfre CDSHS- Kwahu, Afram Plains North
37. Yabram CDSHS- Dambai
38. Krobo CDSHS- Techiman North
39. Agona Fankobaa CDSHS- Agona West
40. Gyaman CDSHS- Gomoa Gyaman
41. Enyanmaim CDSHS- Ajumako Enyan Essiam
42. Kanjaga CDSHS- Builsa South
43. Pakoso CDSHS- Asokore Mampong
44. Gambigo CDSHS- Zuarungu, Bolga East
45. New Longoro CDSHS- Kintampo North
46. Kwamekrom CDSHS- Biakoye District
Other Community Day Senior High School (E-Block) projects that were completed by the NDC/Mahama government but not commissioned and operationalized by December 2016;
1. Mion CDSHS- Mion Constituency
2. Apesua CDSHS- Yilo Kronos
3. Gyarko CDSHS- Techiman Municipality
6. Mpaha CDSHS- Central Gonja District
7. Bamboi CDSH- Bole Bamboi district
8. Obuasi kwabenakwa CDSHS- Obuasi among others.
Having borrowed more monies than all governments since Nkrumah put together with very little to show for, the NPP has shamelessly resorted to plain sophistry to distort the sterling and superior record of the visionary Nation Builder, H.E John Dramani Mahama.
He posits that President John Dramani Mahama stands tall relative to his record of investments not only in educational infrastructure, but in all sectors of the country.
“And no amount of lies can change this fact.”
Nullify Tema Central declaration, I was forced to declare the NDC Candidate as winner – EC official tells Jean Mensa
NDC Sweeps Overwhelming Parliamentary Majority In Historic Election
NDC Apologizes to Former President Kufuor Over Derogatory Remarks
We Are Targeting 32% Of Ashanti Region Votes – NDC Announces
Police Investigate Tragic NDC Rally Accident In Ejura/Sekyedumase Leading To Death Of 8-Year-Old Girl
NDC, NPP Occupy Majority Side Of Parliament Ahead Of Crucial Sitting